Skip to main content

Work at the AWA facility includes the generation of a flexible, gigawatt-scale drive bunch train and the associated diagnostics in the space-charge dominated régime; temporal electron bunch shaping and ring-beam generation both required for high transformer ratio; and emittance preservation issues such as beam break-up control of the drive beam in wakefield structures.